I’ve seen a few projects where customers said they didn’t need contingency, because they decided to adjust the budget as changes happen.

How does this sound to you?

To me, this sounds pretty bad, because there is an important distinction between adjusting the budget based on change requests and consuming the contingency reserve.

[click to continue reading…]

{ 4 comments }

Is an ERP implementation project just a project?

by Vjekoslav Babic on April 6, 2009

image “Software projects are no different from other projects”.

This statement is being repeated over and over at project management courses and seminars, even endorsed in books.

It’s true that software (and ERP implementation, as a subset of software) projects have many traits in common with projects in other disciplines. But ignoring their specifics is almost as wrong as saying that software projects are completely different than other projects.

[click to continue reading…]

{ 1 comment }

5th rule of agile ERP: interface where possible

by Vjekoslav Babic on March 23, 2009

imageOne of the biggest absurdities about ERP systems springs from the very word we use so often when describing ERP: integrated.

ERP is an integrated system: it integrates all data and processes into a single application. Different modules look over different aspects of data and processes, but a change in one module automatically reflects in all others.

A fantastic concept. When it was invented, it streamlined processes, boosted productivity and eliminated overhead and error.

So, whenever a new functionality is needed by a company, it should be integrated into the ERP, to benefit from the integrated system. Right?

Wrong.

[click to continue reading…]

{ 3 comments }

Why is add-on better than custom, any day?

by Vjekoslav Babic on February 16, 2009

image Implementation is like marriage. For better or worse, you choose a piece of software, take it under your roof and commit to it for a long term, so help you God.

And as in marriage, if you want to live happily ever after with your new software, the my way or the highway attitude doesn’t help much—you must be open to compromise.

Last Monday, I argued for avoiding customizations if at all possible, an argument I stand by firmly. It’s like forcing your wife to color her hair pink. I don’t know about your wife, but mine doesn’t color her hair pink. If you like it pink, it’s probably something to think about before turning your yes in.

But NAV is NAV, isn’t it? It has what it has, and if I need it different, I have to customize it, right?

Wrong. You can compromise.

[click to continue reading…]

{ 21 comments }

Default database approach

by Vjekoslav Babic on November 11, 2008

Last Friday, while enjoying a not-at-all healthy Salisbury steak with cheese, I had an interesting discussion with a partner: should NAV consultancies create default databases?

A default database (in this context) is a packaged solution built upon standard Microsoft Dynamics NAV, where a consultancy has introduced a number of features that they sell to all their customers as the standard solution, instead of standard NAV. The modifications to standard NAV can range from simple report adornments to minor feature improvements  to full-scale horizontal or vertical functionalities.

[click to continue reading…]

{ 0 comments }

The Sure Step Rule of Taxi Fare

October 12, 2008

Some time back, as I was riding a taxi from Prague airport to Holiday Inn hotel, I wondered about the fixed price I was about to pay for the ride. – “Airport to city is 700 flat.” – said the driver when I asked how much approximately will it cost. Common wisdom goes that flat [...]

[click to continue reading…]

Diagnostic Phase – a signpost for implementation

September 19, 2008

Each phase of Microsoft Dynamics Sure Step methodology is equally important in an implementation project. You could argue that analysis is the most important, or that design is the most important, or that operation is less important. I’ll paraphrase Scott Adams here and ask: how one phase can be more important if each of them [...]

[click to continue reading…]

A case for Sure Step: how Sure Step brings project success

September 11, 2008

Methodology is a tough topic. There are good methodologies, there are bad methodologies, there are good methodologies gone bad. Methodology is not a silver bullet, it won’t just make any problems disappear, and is hardly ever the single source of success or failure. But a methodology can be a major contributor to success. I could [...]

[click to continue reading…]

Serial Numbers Conundrum

July 25, 2008

A blog reader has asked me for help about an allegedly strange behavior of items with serial number tracking. They had a customer who had serial number tracking switched on for an item with FIFO costing method. Whenever they posted a sales transaction, they chose the serial number manually. Then they noticed a puzzling behavior. [...]

[click to continue reading…]

Standard enemy

May 15, 2008

The biggest jeopardies often lurk where we least expect them. When implementing an ERP system such as Microsoft Dynamics NAV, what should be one of our best allies, turns out to be our mortal enemy. It has a simple name: The Standard. Standard processes, standard functionality, standard documents, standard system. All these gizmos can turn [...]

[click to continue reading…]

Business case – do I eat it or?

May 8, 2008

It’s a well known fact that IT projects fail every so often. Standish Group has been researching the success and failure factors of IT projects for a decade and a half, and they publish their results in their CHAOS report every two years or so. According to their 2006 report, only about 35% of projects [...]

[click to continue reading…]